COLADO DE FIRME


Proceso

· Elaboración del firme con la malla electrosoldada, colocada al fondo del firme antes de ser colado el sitio y quedar ahogada en el concreto. La malla electrosoldada de varilla #3 con diámetro de ¾ de pulgada. 

· Eliminar muestra de concreto ubicada al  centro del epacio ya que estorbaba para poder colocar la malla. A partir de esta se tomaron nuevas medidas para crear las muestras en los costados y que estos no estorbaran con los demás materiales y técnicas de ejecución.

· Se recolectaron pedazos de block de concreto con un grosor de 5cm para ser  usados como silletas debajo de la malla. 

· Se cortaron pedazos de varilla  No. 4 para armar con ellas unos ganchos que se enterraron posteriormente en la tierra sobre la malla para que esta no se levantara y quedara al exterior a la hora de haber el colado.

· Un grupo de personas se encargaron de realizar la mezcla, esta ya estaba lista para que  se trasladara en las carretillas y cubrir la malla con 20 cm de grosor de concreto .

· Una vez que las muestras habian endurecido y la mezcla había sido vaciada, se utilizaron 2 triplays de madera alargados como reglas para nivelar el concreto, este se moja y se le espolvore cemento para que quede liso y sin huecos.

English

CONCLUSION CLEANNING

Process

 • It was begun to clean the laying of foundations, because imperfections within the laying of foundations existed which caused that at the time of making level block was not measured wing, 

•  With thread, tape to measure and sealed with lead, volume as reference the axis of the castle to find the center and from was marked there to 7,5 cm of the center towards the sides to list the limit of the wall.


•  Mortar was prepared, which would be placed in the laying of foundations, to begin to stick block and to make level it.

• The first race in reference to the thread became which marked the limit of block and its height. 



•  The second race began with half of block, for the arrangement of tizón and soga. In agreement advanced it was run the thread to each 20 cm.

•  The armed one of the centering was realised with the measures of 2 M of length by the height of 15 cm which was marked with nails to stay as hanging of the blocks to 

•  The castles were only covered with tables with 1m of stop and width of 30 cm so that it was of exceeded way. 

• For the armed one of the closing the armed one of steel was placed on the model,  that were on block.

•   The elaboration of the mixture was carried out in a cleared and dampened place. 

• The casting was realised with shovels filled the closing and scattering it with spoons towards the other sides and the castles.